I shipped my deuce and a half from Denver, to San Angelo.
Paid pretty much the same amount. But it was worth it. Now all we are waiting for is to get the new storage unit. I'm waiting on them to 'finish' everything, but especially waiting on the water for a functional bathroom. The unit is finished and has power. Bathroom is done and it has a smaller sink and then there is a larger square sink on the other side of the wall of the bathroom in the main storage area. But it will be another couple of weeks before the water will be working.
I'm going over this afternoon with my shop vac and suck up the remaining dead cricket carcasses that I could not sweep out because they were in the steel channels of the walls. I can get to them, but my shop vac will make quick work out of that job.
Once we get water, I will power wash the new concrete floor. Let that dry for at least three days. Then I am going to use Rust-Olem Battleship Gray concrete floor paint to seal the concrete - I'm buying 5 gals and hope it covers the 1800 sq ft. Let that dry for five days (for driving vehicles on the paint). That way when (not if) one of my vehicles leaks, it won't affect the concrete floor. All I will have to do is wipe up the mess with a paper towel and throw that away.
After that we are planning to install four to six of the Edsal steel shelves from either Lowe's or Home Depot. Cost is roughly $200 each for the 72x77x24 inch shelves. Or for a smaller version of the same shelving unit by Edsal that is 65x54x24 $150 each so we could get a couple more. Both sets only have three shelves (bottom, middle, top) and the cheaper one would be easier to get things off the top shelf (54 inch vs 72 inch height) which is a bit easier on the wife and I.
Then I can move the deuce, my two military trailers, our Excursion, the wife's MB SLK 32 AMG and possibly my Mom's Lincoln Town car over to the unit.
All of the above I can accomplish with out any help.
However the remainder of 'my junk' as the wife calls it, are in three 20 x 20 storage units and we will hire some young men from the local church and they will attack them one at a time. Probably three days worth of work. I don't do the heavy lifting any more. I PAY the young bucks to do that.
Well that's it for now. I will update it with pix once we get into the new storage unit, each step of the way...