moderator
Here you go, not mine...

Something you do NOT normally see every day...

Ferrari 360 Spyder on a Uhaul transporter.jpeg  That is a FERRARI 360 Spider  ON A UHAUL TRANSPORTER no less

Very expensive car ($80K ish) on a VERY CHEAP auto transporter?!?!?!

You can't make this stuff up
Reply 0 0
Kurganhunter
No, No you cannot. You normally don't see that because normal car people don't do that. My 54' went from Iowa to CT then from CT to CO on a transport truck. Total shipping cost both ways was $1700. Maybe there was no money left after buying the car lol
Reply 0 0
moderator

I shipped my deuce and a half from Denver, to San Angelo.

Paid pretty much the same amount.  But it was worth it.  Now all we are waiting for is to get the new storage unit.  I'm waiting on them to 'finish' everything, but especially waiting on the water for a functional bathroom.  The unit is finished and has power.  Bathroom is done and it has a smaller sink and then there is a larger square sink on the other side of the wall of the bathroom in the main storage area.  But it will be another couple of weeks before the water will be working.

I'm going over this afternoon with my shop vac and suck up the remaining dead cricket carcasses that I could not sweep out because they were in the steel channels of the walls.  I can get to them, but my shop vac will make quick work out of that job.

Once we get water, I will power wash the new concrete floor.  Let that dry for at least three days.  Then I am going to use Rust-Olem Battleship Gray concrete floor paint to seal the concrete - I'm buying 5 gals and hope it covers the 1800 sq ft. Let that dry for five days (for driving vehicles on the paint). That way when (not if) one of my vehicles leaks, it won't affect the concrete floor.  All I will have to do is wipe up the mess with a paper towel and throw that away.

After that we are planning to install four to six of the Edsal steel shelves from either Lowe's or Home Depot.  Cost is roughly $200 each for the 72x77x24 inch shelves.   Or for a smaller version of the same shelving unit by Edsal that is 65x54x24 $150 each so we could get a couple more.  Both sets only have three shelves (bottom, middle, top) and the cheaper one would be easier to get things off the top shelf (54 inch vs 72 inch height) which is a bit easier on the wife and I.

Then I can move the deuce, my two military trailers, our Excursion, the wife's MB SLK 32 AMG and possibly my Mom's Lincoln Town car over to the unit.

All of the above I can accomplish with out any help. 

However the remainder of 'my junk' as the wife calls it, are in three 20 x 20 storage units and we will hire some young men from the local church and they will attack them one at a time.  Probably three days worth of work.  I don't do the heavy lifting any more.  I PAY the young bucks to do that.

Well that's it for now.  I will update it with pix once we get into the new storage unit, each step of the way...

Reply 0 0
Kurganhunter
Jim, Try opening the door and using a leaf blower to clean house. As far as floor paint the mfg says 300-400 sqft per gallon on smooth surface. I did that back in CT. The first 95 plus degree day two weeks after application, I parked after a 40 mile drive. I pulled out the next day with 4 missing pieces that were stuck to my tires. I would recommend epoxy floor paint. It is more expensive but, uses the same application process and lasts much longer. My new garage in CO has epoxy. I am going to get the Mychanic Teflon wheeled rolling jack just to be on the safe side. Mike
Reply 0 0
wallew
Mike,

The paint I'm looking at says specifically:

"Rust-Oleum 5 gal. Battleship Gray Concrete Floor Paint concrete and garage floor coating is a ready to use interior/exterior concrete floor paint specifically formulated for use on garages, carports, basements, porches and more. A single coat of this self-priming concrete floor paint saves time and money. Rust-Oleum's advanced acrylic technology resists damage from hot tires, motor oil, grease and gasoline. The durable, UV and weather-resistant satin finish is easy to maintain and resists fading and peeling."

It says to let it dry for 24 hours, then you can walk on it - let it dry 5 days and then you can drive on it.  IDK, we will see.  We get a LOT HOTTER than 95 here - 115 is not unusual in late July - through August or September.  I'm considering putting up some insulation on the west wall and then put some sheet rock up on the west wall as well.  Two sheets tall would be 8 ft up, more than enough.

I won't be in this space during that time period.  And IF I do, it will be late at night or early morning.  And it will still suck.
Reply 0 0
Kurganhunter
Jim, Hopefully the paint is formulated better than when I did mine
Reply 0 0
Jamie
Sounds like someone else is getting a new toybox!  Looking forward to seeing photos!  Did you happen to read the sign in the window of the Ferrari?  Curious if it was a hand made for sale sign or a "No touchy!" sign.  I wouldn't haul a project out of a farm field with a U haul trailer, much less cross country with something like that.  Wow.  However, I guess you have to do what you have to do.
Reply 0 0
moderator

Yeah that is the plan.  And once we are in the unit, I will post up pictures of what it looks like.  We will see.

1800 square feet, which is 600 square feet more than we have right now.  They have not gotten the water install finished yet.  Getting closer.  Hopefully we can have them tell us when the water is on.  And then we have to get the power company to put the bill in our name.
Once all that occurs, then I will clean the floor with water.  Then after that dries for at least thee days, I will paint the floors.

Then the shelves go in and FINALLY the vehicles and all our other stuff will get moved from the three 20x20 storage units to the 1800 square foot storage unit.

I will let you know AND post up pictures.

Reply 0 0
Kurganhunter
Are we there yet?  Jim, On 10/20 you said " a couple of weeks". Are you in your toybox yet? Would love to see pics of it. Mike
Reply 0 0
moderator

The floors have been cleaned with the help of my wife. 

I waited more than a week to let the floors dry AND the facility finally poured the rest of the concrete.

Then painted the floors gray.

that is the bathroom and the electrical panel at the back of the unit
lights and bathroom with floor painted.jpg 
And here is the front of the unit with the large door and a regular entrance door.large door and small door entrances.jpg  If you look at the floor, I had to hit it with a second coat.  The paint went down fairly easy in about four hours and looked great.  Then after it dried, you could see streaks of unpainted concrete starting to show through. So I went back with one more gallon and hit it with more paint and at least the concrete is now sealed.  You can see the streaks of the new gallon of paint...

Just waiting for them to finish installing the gates and the security systems transferred to the facility, right now the security system is 'monitored' in the corporate offices in Lubbock.

I'm hoping around the first of December?  If we are lucky.  I have purchased and picked up (LONG STORY) five steel shelving units that I will install in the unit before anything goes in.  Plus I have a compressor that will be installed and wired into the system (I got permission to do that).

Reply 0 0
Kurganhunter
😃 Jim, That's a cool toybox. Congratulations. Play and enjoy. Mike
Reply 0 0
Jamie
That looks like a great looking space!  Lots of overhead room too!  Great for storing up the walls with shelving.  Get a forklift and you have all sorts of height possibilities!  Room for a gantry or rail crane.......or......oh the possibilities!!  It's always fun to fill out a new space just the way you want it.  Congratulation!
Reply 0 0
moderator
Shelving, yes I've already purchased it.  Five sets of Red and Black (HK themed) Husky shelving

red black shelving units husky.jpg 
And we are going to start moving in some time in the next couple of weeks.  Still waiting on them to finish the security systems - electronic gates that open to codes and then the security cameras have to be hooked to the facility, because currently they are being monitored in Lubbock (corp hq).  There is a security camera right over the entrance to my unit, so IF there are ever any problems at least there will be footage of whoever broke in...

Just have to see that get finished and then schedule a few young men to do the physical labor of getting it all moved.  When that occurs, I WILL post more pix.

And still have three vehicles and maybe two trailers to store there as well.  I will take pix.
Reply 0 0
moderator

OK, the new storage unit is NOW ready to occupy.  They finally got the security systems finished and working.

The deuce has been moved over to the new unit as of late yesterday.  Today I went over and replaced a broken lock on the large door.  And put together the first of five shelves.

I will take a couple of pictures tomorrow after I build the other four shelves.  The first one went together pretty easy.  So, now all I have to do is the last four.  We have four high school teenagers showing up on Saturday to move all our stuff over to the new unit over this weekend and if necessary, the remaining stuff next weekend.  And we pay them in cash... we will see.

I will POST PICTURES sometime tomorrow afternoon.

Reply 0 0
moderator
As promised, several pix of the inside of my new storage unit.  I AM GETTING THERE.  Moving in on Sat/Sun with the help of four high school students.

NS 1.jpg  Entrance to the unit

NS 3.jpg  Another angle of the front entrance with a slice of the Excursion on the right

NS 4.jpg 
and another front shot

NS 6.jpg  And the DEUCE enters the picture

NS 7.jpg  The back part of the shop

NS 8.jpg The rear of the shop, showing the three empty boxes that the first shelves that I assembled came in.  I'm using the packing materials to insulate the back wall.  That will be a slow project in the coming weeks.

I've got two more shelves to assemble tomorrow.  Then on Saturday, we start moving all my SHEET (that what she calls it) into the new unit from the old ones.  We currently have three 20x20 units about ten minutes from this new unit.  BOTH storage facilities are owned by the same company (out of Lubbock).
Reply 0 0
Reply